// geodetic engineer hydro-oceanographic & subsea survey

Aldika Kurniawan

Marine & Offshore Survey Operations Leader

Leading marine and offshore survey operations for energy infrastructure projects from subsea pipeline and hydrographic survey to tender support and business development across South-east Asia's oil & gas sector.

Photo of Aldika Kurniawan
92Projects
7Countries
12+Years
68+Clients

Marine and offshore survey operations professional with 12+ years of experience across oil & gas, subsea, pipeline, offshore infrastructure, geospatial, bathymetric, geophysical, dimensional control, and inspection projects. Career began in hands-on technical survey execution — field survey, data acquisition, dimensional control, 3D laser scanning, offshore inspection, pipeline inspection, DGPS/gyro calibration, and survey reporting. Progressed over time into project management, technical coordination, operations leadership, client interface, tender support, and business development. This combined technical and commercial background bridges field execution, engineering requirements, project delivery, client expectations, and business objectives. Supported projects for major oil & gas, EPC, subsea, marine, and energy clients across Southeast Asia, including offshore pipeline, subsea infrastructure, FPSO-related inspection, cable lay, pre-lay, as-built survey, hydrographic/bathymetric survey, and marine construction support. Holds a B.Eng. in Geodetic Engineering from Universitas Diponegoro, with a thesis on land subsidence of Semarang City using GAMIT.

Available

for Collaboration & Long Term Engagements

Open to opportunities in survey operations, project management, and client-facing roles with international teams.

Survey Operations Manager Client Representative Survey Project Manager Project Surveyor Survey Party Chief
Discuss a Project →

Software I Work With

Navigation & Acquisition

EIVA NaviPacEIVA NaviScanQPS QinsyHYPACK

Sonar Processing

SonarWiz

GIS & Mapping

ArcGISQGIS

CAD & Planning

AutoCAD (2D & 3D)MS ProjectSharePoint

Equipment

Sonardyne USBL & LodestarHiPAPR2Sonic multibeamEdgeTech 4200 side scanValeport IPS 10 barVeripos LD8

Self-developed Tools

DGNSS verification appNMEA survey simulator

Career Journey

From field surveyor to operations leadership across 5 companies.

View timeline →

Project Portfolio

92 projects across 7 countries, mapped and detailed.

Explore projects →

Technical Writings

Survey procedures and field notes, offshore to onshore.

Read writings →
Survey projects per country
CountryProjects
Indonesia65
Singapore17
Malaysia5
Vietnam2
China1
Thailand1
Papua New Guinea1

Project locations across 7 countries — see full breakdown →

Software & Tools

Windhire Live

Windhire

Preliminary Wind Screening Analysis for the Proposed Study Area

Open Tool →
Dhyrion — Survey Data Simulator Live

Dhyrion — Survey Data Simulator

Simulator for testing and training on survey navigation software.

Open Tool →
DGNSS Verification Tools Live

DGNSS Verification Tools

- Compares vessel GNSS positions against Total Station control - Reports accuracy at 95% (2.448 factor, bias included) following the IOGP 373-19 / IMCA S 015 approach - PASS/FAIL against a limit you choose: IOGP typical accuracies, IHO S-44 orders, or your client's spec.

Open Tool →