Survey & Software

92Projects
7Countries
12+Years
68+Clients
Survey projects per country
CountryProjects
Indonesia65
Singapore17
Malaysia5
Vietnam2
Thailand1
Papua New Guinea1
China1

Marker size shows project count per country — click to see the project list.

Clients

Survey Projects

2026 3 projects
Pre-Lay SurveyPipelay SurveyAs-Laid SurveyAs-Built SurveyUSBLROVEIVA NaviPac

Pre-Engineering, Pre-Lay, Installation Support, As-Laid & As-Built Survey: WNTS to Pemping Island Gas Pipeline

Client
TIMAS - PLN EPI
Location
Indonesia

End-to-end survey and positioning for a subsea gas pipeline from the West Natuna Transportation System to Pemping Island, Batam, from pre-engineering through as-built, delivered for PLN EPI through the EPCI contractor TIMAS Suplindo. The pipeline supports domestic gas supply to Batam's power system, with a scope covering offshore hot-tapping, offshore and onshore pipeline construction, and an onshore receiving facility. From December 2025 to June 2026, Atlantis Subsea Indonesia delivered pre-engineering and pre-lay survey (geophysical survey, onshore topography and geotechnical soil investigation); survey and positioning support for pipeline installation using USBL and ROV positioning; as-laid and as-built survey; and positioning support for concrete mattress installation and valve opening. The work was spread across pipelay and support vessels, survey boats and a dive support vessel. As Survey Operations Manager, I oversaw engineering, logistics, crewing, workshop and field teams, reviewed the survey and positioning procedures through to client approval, and led mobilisation in Batam.

All phases completed on schedule, from December 2025 to June 2026.

Pipelay SurveyAs-Laid SurveyUSBLROVSide Scan SonarEIVA NaviPac

Survey & Positioning for Offshore Pipelay and As-Laid Survey: Block B O Mon Gas Pipeline (PC2)

Client
TIMAS - Petrovietnam
Location
Vietnam

Survey and positioning support for the installation of a 28-inch offshore gas pipeline (approx. 213 km) in the Southwest Sea of Vietnam, delivered through the VSP-TIMAS-TCO consortium for SWPOC. Under the PC2 offshore package, the pipeline runs from the Subsea Isolation Valve at the Block B Central Processing Platform to KP 213. Atlantis Subsea Indonesia provides pipelay assistance on the lay vessel, including touchdown monitoring with ROV and USBL; tie-in spool, temporary sleeper and concrete mattress installation; and an as-laid survey (side scan sonar, singlebeam echosounder and USBL), planned to run in parallel with pipelay in the next campaign. As Survey Operations Manager, I oversee engineering, logistics, crewing, workshop and field teams, review the survey and positioning procedures through to client approval, and lead mobilisation in Batam.

First campaign (August – September 2026) mobilised and executed on schedule. Project ongoing.

Pipelay SurveyPLEM InstallationMooring SurveyUSBLROVEIVA NaviPac

Survey and Positioning for Pipeline, Mooring and PLEM Installation: Kutubu KPS FSO Project (Papua New Guinea)

Client
TIMAS - Santos
Location
Papua New Guinea

Survey and positioning support for the installation of a 20-inch export pipeline, PLEMs, tie-in spools and FSO mooring system in Papua New Guinea, delivered through TIMAS Suplindo for Santos. The KPS FSO Project replaces the ageing Kumul Marine Terminal export infrastructure with a new FSO facility, tied in through a new 20-inch pipeline of about 19 km in 20 to 65 m of water. Atlantis Subsea Indonesia provides survey and positioning for pipelay, tie-in spools, spool support piles, mooring piles and chains, PLEM installation and as-laid survey, using USBL, ROV and EIVA NaviPac. As Survey Operations Manager, I oversee engineering, logistics, crewing and mobilisation, and review the survey procedures through to client acceptance.

Campaign scheduled for November 2026, currently in mobilisation.

2025 4 projects
Geophysical Survey

Pipeline Inspection Survey at East Java Gas Pipeline (EJGP) — Freespan Identification

Client
Pertamina Gas
Location
Indonesia
Post-Lay SurveyFreespan SurveySide Scan SonarUSBLEIVA NaviPac

Post-Lay, Freespan, As-Built and CP Survey Support: JDA Block B-17-01 Field Development (Phase 6)

Client
TIMAS - CPOC
Location
Thailand

Post-installation survey and positioning support for five 16-inch satellite pipelines in the Malaysia-Thailand Joint Development Area, delivered through TIMAS Suplindo for Carigali-PTTEPI Operating Company (CPOC). Phase 6 of the JDA Block B-17-01 development adds five satellite wellhead platforms tied back by five 16-inch pipelines in about 62 to 70 m of water in the Gulf of Thailand. Atlantis Subsea Indonesia provided survey and positioning services to the EPCI contractor, and I joined the team while the post-lay campaign was underway. The post-lay work covered side scan sonar survey for pipeline position and freespan identification, supported by USBL positioning and EIVA NaviPac. As Survey Operations Manager, I oversee the engineering, logistics, crewing and field teams supporting the campaign.

Topside Installation SurveyROV Debris SurveyUSBLEIVA NaviPac

Topside Installation, Debris Removal and ROV Valve Intervention Survey Support: Terubuk Development

Client
Medco Energy
Location
Indonesia

Survey and positioning support for wellhead platform topside installation, subsea debris removal and ROV valve intervention in the Terubuk field, South Natuna Sea, delivered through TIMAS Suplindo for Medco E&P Natuna. The Terubuk development comprises two minimum-facilities wellhead platforms, a 14-inch export pipeline and an in-field flowline tied back to the existing Belida facilities. Atlantis Subsea Indonesia provided survey and positioning support to the EPCI contractor during offshore execution in mid-2025, covering topside installation on a derrick lay barge (anchor pattern setup, verticality and deck levelness checks, platform orientation), ROV-based debris survey and removal at both platforms, and ROV positioning for subsea valve intervention. I joined ASI during this campaign as Survey Operations Manager.

ROV Pipeline SurveyAs-Built SurveyFreespan SurveyCP SurveyUSBLEIVA NaviPac

ROV As-Laid, Freespan Rectification, As-Built and Cathodic Protection Survey: Sisi Nubi AOI Development, EPSCC Package B

Client
Pertamina Hulu Mahakam
Location
Indonesia

ROV-based pipeline survey for six 8-inch gas pipelines in the Mahakam delta, East Kalimantan, delivered for Pertamina Hulu Mahakam through the EPSCC contractor. The Sisi Nubi AOI development tied six new wellhead platforms back to existing facilities through six 8-inch gas pipelines of 2.3 to 4.8 km each, in about 65 to 80 m of water offshore East Kalimantan. Atlantis Subsea Indonesia provided ROV-based survey services across the pipeline life cycle: as-laid survey and freespan identification; post-rectification survey after freespan correction; as-built survey with cathodic protection readings; and subsea debris survey and recovery at two platforms. The as-built campaign in July 2025 included USBL and profiler calibration. As Survey Operations Manager, I joined ASI during this campaign and checked the as-built survey report before submission to the client.

2024 3 projects
Pre-EngineeringTopographic SurveyBathymetric SurveyGPRProject Management

Cirebon–Semarang Phase 2: Pre-Engineering Survey for a 20-Inch Onshore Gas Pipeline (245 km)

Client
Timas - Pratiwi
Location
West Java – Central Java

Project Manager for the full pre-engineering survey of a 245 km, 20-inch onshore gas pipeline route for the Ministry of Energy and Mineral Resources (ESDM), delivered through KSO TIMAS-Pratiwi. Led a team of about 46: 8 topographic teams, 2 bathymetric teams covering 18 river crossings, 2 ground-penetrating radar teams and 8 drafters. Equipment included Comnav T300 and Leica GS18 GNSS, a D300 single-beam echosounder, MALA GPR, and a DJI M350 with L2 LiDAR and aerial imagery for QC, with processing in Leica Hexagon and Comnav software and final drawings in AutoCAD. Served as the main client contact and presenter of results, ran QA/QC, and issued the final documents and hard-copy reports.

Completed on schedule in 6 months, at 2 km of topography and 2 river crossings per day, with a daily coordination basecamp and daily data hand-off to drafters along the 245 km route.

Inspection

Turn Around & Maintenance Line Paraformaldehyde Inspection

Client
Dover Chemical
Location
Cilegon
LiDAR

Aerial Lidar Survey for Sambar-2 Oil Well Development

Client
Medco Energy
Location
South Sumatera
2023 8 projects
Bathymetric

Aerial Lidar and Bathymetric Survey for Rawa #54 Oil Well Development

Client
Medco Energy
Location
South Sumatera
Scanning

Volumetric Tank Scanning and Remaining Life Assessment

Client
PHE ONWJ
Location
Jakarta
Pipeline

Topographic Survey for Boyolali - Pengapon Crude Oil Pipeline Development

Client
PGN Solution
Location
Central Java
Pipeline

Soil Test for Boyolali - Pengapon Crude Oil Pipeline Development

Client
PGN Solution
Location
Central Java
Pipeline

Bathymetric Survey for Boyolali - Pengapon Crude Oil Pipeline Development

Client
PGN Solution
Location
Central Java
Pipeline InspectionBuoy InstallationFreespan RectificationAnode RepairTechnical Manager

Buoy Fabrication, Replacement and Maintenance (2 Years Contract)

Client
Nusantara Regas
Location
Jakarta

Two-year contract (2023 to 2025) covering annual inspection of a 15 km subsea pipeline, pipeline marker buoy fabrication and installation, freespan rectification and anode repair. Technical Manager for the contract.

Prepared the recovery procedure for a marker buoy after one of its anchors failed, and the technical justification for the client's request to SKK Migas for additional ORF maintenance budget.

Pipeline

Underground Pipeline Leak and Anomaly Identification

Client
Dover Chemical
Location
Cilegon
Pipeline

Aerial Photogrammetry for Senipah - Balikpapan Gas Pipeline Development

Client
PGN Solution
Location
South Kalimantan
2022 5 projects
Scanning

Tank Inspection Using 3D Laser Scanner

Client
PHE ONWJ
Location
Jakarta
LiDAR

Lidar and Photogrammetric Survey at TSF 30 Banyuwangi

Client
PT Merdeka Mining Service
Location
Banyuwangi
Decommissioning

Attaka Field Platform Decommissioning

Client
KHAN Offshore
Location
East Kalimantan
Pipeline

Inspection of SPM, PLEM and Subsea Pipeline

Client
Trans Pacific Petrochemical Indotama
Location
Tuban
Geophysical SurveyGeotechnical SurveyBathymetric SurveyProject Management

Coastal Study for Belawan Port Development

Client
PELINDO
Location
Medan

Geophysical and geotechnical survey for the Pelindo Belawan Port Expansion Phase 2 feasibility study, managed from start to finish, including preparation of the survey procedure.

2021 13 projects
Pipeline

PGN LNG Pipeline & Yoke Survey Inspection

Client
PGN LNG
Location
Lampung
Bathymetric

Bathymetric Survey on Inter-Tidal Area of PLTU Karang Kandri

Client
Adhi Karya
Location
Cilacap
LiDAR

Lidar Survey for PLTM Besai Kemu Feasibility Studies

Client
Acset Indonusa
Location
Lampung
LiDAR

Lidar Survey for Road Access Feasibility Studies

Client
Waskita Karya
Location
Lampung
LiDAR

Lidar Survey for Power Line Assessment

Client
PT PLN
Location
Borneo Operation
LiDAR

Lidar & Photogrammetry Survey for Mining Operation & Development

Client
Merdeka Copper Gold
Location
Banyuwangi
Photogrammetry

Photogrammetry Survey for Way Sekampung Dam Road Development

Client
PT PP
Location
Lampung
LiDAR

Photogrammetry & Lidar Survey for KEK Sukabumi Feasibility Studies

Client
Amarta Karya
Location
Sukabumi
LiDAR

Lidar Survey Services, Region 4

Client
Kementerian ESDM
Location
Tampomas
LiDAR

Lidar Survey for Road Access Feasibility Studies

Client
Hutama Karya
Location
Gresik
Scanning

Volumetric Tank Scanning

Client
Dover Chemical
Location
Merak
LiDAR

Lidar Survey Services, Region 3

Client
Kementerian ESDM
Location
NTB-NTT
MultibeamSearch SurveyParty Chief

Multibeam Search of the SJ182 Crash Site

Location
Kepulauan Seribu

Multibeam echosounder search of the seabed at the SJ182 crash site in Kepulauan Seribu. Party chief for the survey team.

2020 7 projects
Subsea CableCable LayPre-Lay SurveyAs-Laid SurveyBarge PositioningAnchor HandlingSeabed SurveySide Scan SonarSub-Bottom ProfilerEIVA NaviPacQPS QinsyDGNSS

Subsea Power Cable Replacement, Pabelokan to Nora-A: Pre-Lay, Lay Support and As-Laid Survey

Client
PHE OSES
Location
Pabelokan Island to Nora-A Platform, Kepulauan Seribu, Indonesia

Survey and positioning for the replacement of a 15 kV subsea power cable, in three consecutive phases: a pre-lay seabed survey of a 1 km x 9.8 km corridor (single-beam echosounder, side scan sonar, sub-bottom profiler, Trimble DGNSS, QPS Qinsy), real-time barge and anchor-handling positioning during the cable lay (EIVA NaviPac, 23 Aug – 6 Sep 2020), and the as-laid survey that followed. Project Manager onshore and offshore, with teams of 8, 6 and 8 people across the three phases.

Prepared the positioning survey procedure for the cable lay and ran all three phases back to back, from pre-lay route survey to as-laid, with the same survey company.

Dimensional Control

Hornsea-2 Dimensional Control Service

Client
Ørsted
Location
Batam
Survey

MS1 Valaris Project

Client
AME
Location
Singapore
Installation

CO2 Extraction Development Project

Client
British American Tobacco
Location
Malang
Installation

Julimar Block Development Project Phase 2

Client
McDermott
Location
Batam
Installation

Tyra Gas Block Development

Client
McDermott
Location
Batam
Survey

Offtake Station 3D Digitalization

Client
SENA
Location
Cirebon
2019 2 projects
Survey

IMR Campaign 2019

Client
Pertamina EP 3
Location
West Madura Offshore
Installation

Coarse Ore Stockpile Hopper Development

Client
BHP Billiton
Location
Tianjin
2018 6 projects
Survey

IMR Campaign 2018

Client
PHE-WMO
Location
Gresik
Survey

Bukit Tua Database Management System

Client
Petronas
Location
Gresik
Pipeline InspectionSide Scan SonarSub-Bottom ProfilerUSBLFreespan SurveyProject Surveyor

Ruby Field Pipeline Inspection

Client
Mubadala Petroleum
Location
Balikpapan

Full-length inspection survey of about 298 km of subsea pipeline: side scan sonar, sub-bottom profiler and USBL inspection, with freespan and pipe support survey. Project Surveyor (party chief) for the survey team.

Supported the team's rectification of the client review report and prepared the answers to the client's questions.

Installation

Greater Western Flank Development

Client
Subsea 7
Location
Vungtau
Installation

BOMC Jetty Development

Client
Qube Offshore
Location
Batam
Cable & Subsea

Ichthys Umbilical, Flowline & Riser Project

Client
McDermott
Location
Batam
2017 12 projects
Survey

IMR Campaign 2017

Client
Pertamina EP-3
Location
Cirebon
Inspection

Load Buckle Identification & Inspection

Client
Caterpillar
Location
Batam
Installation

Yamal Gas Development Project

Client
Siemens Oil & Gas
Location
Batam
Survey

PHE-12 Tilting Monitoring

Client
PHE-WMO
Location
West Madura Offshore
Cable & Subsea

Ichthys Umbilical, Flowline & Riser Project

Client
Mcdermott
Location
Singapore
Installation

Culzean Block Development

Client
Sembcorp Marine
Location
Singapore
Geotechnical

Offshore Geotechnical Soil Investigations

Client
Qube Offshore
Location
Bintan
Survey

Finite Element Analysis on Tank V100B

Client
South Pacific Viscose
Location
Purwakarta
Pipeline

Offshore Pipeline Inspection, Debris & Anomaly Identification

Client
PHE-WMO
Location
West Madura Offshore
Calibration

Norman Vision Calibration

Client
McDermott
Location
Batam
Inspection

Flare Inspection Using Drone

Client
PHE-WMO
Location
West Madura Offshore
Geophysical

Offshore Geophysical Survey

Client
PHE-WMO
Location
West Madura Offshore
2016 14 projects
Cable & Subsea

Jangkrik Subsea Development

Client
Technip
Location
Batam
Cable & Subsea

Ichthys URF Development

Client
Neptune Marine Service
Location
Batam
Survey

Jascon 34 Layout Support

Client
Sea Truck Group
Location
Batam
Survey

PHE ONWJ LIMA Deck Raising Project

Client
TIMAS
Location
Offshore North West Java
Scanning

Umbilical Reel Scanning

Client
Aquatic Subsea
Location
Singapore
Dimensional Control

Pile Guide Frame Dimensional Control Survey

Client
AMANIAGA
Location
Malaysia
Dimensional Control

Skandi Hercules Dimensional Control Survey

Client
DOF Subsea
Location
Malaysia
Survey

Van Oord Crane Alignment Survey

Client
Van Oord
Location
Singapore
Inspection

12-Man Diving Chamber Inspection

Client
Offshore Construction Services
Location
Singapore
Installation

Jangkrik Complex Development

Client
Siemens Oil & Gas
Location
Batam
Installation

Jangkrik Complex Development

Client
Saipem
Location
Tanjung Balai Karimun
Survey

Seabed Survey

Client
McConnell Dowell
Location
Singapore
Inspection

24-Man Diving Chamber Inspection

Client
Offshore Construction Specialist
Location
Singapore
Scanning

MOPU Rubicone 3D Scanning

Client
WorleyParsons
Location
Batam
2015 8 projects
Installation

Upper Zakum Complex Development

Client
Siemens Oil & Gas
Location
Batam
Dimensional Control

M65 Structure Dimensional Inspection

Client
Modec
Location
Singapore
Scanning

KILN-4 3D Modelling

Client
VALE
Location
Sorowako
Scanning

Lexmar 3D Scanning

Client
Lexmar Engineering
Location
Singapore
Installation

Ichthys Project Development

Client
Neptune Marine Service
Location
Malaysia
Dimensional Control

3P Refinery Structure Dimensional Control Service

Client
Modec
Location
Singapore
Dimensional Control

PIT Structure Dimensional Inspection

Client
Petrobras
Location
Batam
Scanning

Temple Scanning for Heritage Preservation

Client
SUTD
Location
Singapore
2014 7 projects
Dimensional Control

Stone FPSO Dimensional Control Services

Client
SBM Offshore
Location
Singapore
Inspection

Ningaloo FPSO Structure Inspection

Client
Apache Energy
Location
Singapore
Calibration

Skandi Singapore DGPS and Gyro Calibration

Client
DOF Subsea
Location
Singapore
3D ScanningSurveyor

Malaysia National Museum Scanning for 3D Art & Entertainment

Client
Cantuman Bhd
Location
Malaysia
Pipeline InstallationSurveyor

Castorone DGPS and Gyro Calibration

Client
Saipem
Location
Singapore
DredgingData ProcessorLeica Cyclone

Jurong Island Extension Project

Client
DIAP SHAP JV
Location
Singapore
Dimensional ControlLeg and TopsideSurveyor

Shell Malampaya Depletion Completion Platform

Client
EEW
Location
Malaysia

Software & Tools

Windhire Live

Windhire

Preliminary Wind Screening Analysis for the Proposed Study Area

Open Tool →
Dhyrion — Survey Data Simulator Live

Dhyrion — Survey Data Simulator

Simulator for testing and training on survey navigation software.

Web-based NMEA-0183 simulator for testing and training on survey navigation software.

Open Tool →
DGNSS Verification Tools Live

DGNSS Verification Tools

- Compares vessel GNSS positions against Total Station control - Reports accuracy at 95% (2.448 factor, bias included) following the IOGP 373-19 / IMCA S 015 approach - PASS/FAIL against a limit you choose: IOGP typical accuracies, IHO S-44 orders, or your client's spec.

- Compares vessel GNSS positions against Total Station control - Reports accuracy at 95% (2.448 factor, bias included) following the IOGP 373-19 / IMCA S 015 approach - PASS/FAIL against a limit you choose: IOGP typical accuracies, IHO S-44 orders, or your client's spec.

Open Tool →