Pre-Engineering, Pre-Lay, Installation Support, As-Laid & As-Built Survey: WNTS to Pemping Island Gas Pipeline
- Client
- TIMAS - PLN EPI
- Location
- Indonesia
End-to-end survey and positioning for a subsea gas pipeline from the West Natuna Transportation System to Pemping Island, Batam, from pre-engineering through as-built, delivered for PLN EPI through the EPCI contractor TIMAS Suplindo. The pipeline supports domestic gas supply to Batam's power system, with a scope covering offshore hot-tapping, offshore and onshore pipeline construction, and an onshore receiving facility. From December 2025 to June 2026, Atlantis Subsea Indonesia delivered pre-engineering and pre-lay survey (geophysical survey, onshore topography and geotechnical soil investigation); survey and positioning support for pipeline installation using USBL and ROV positioning; as-laid and as-built survey; and positioning support for concrete mattress installation and valve opening. The work was spread across pipelay and support vessels, survey boats and a dive support vessel. As Survey Operations Manager, I oversaw engineering, logistics, crewing, workshop and field teams, reviewed the survey and positioning procedures through to client approval, and led mobilisation in Batam.
All phases completed on schedule, from December 2025 to June 2026.