Survey Operations Manager
PT. Atlantis Subsea Indonesia
Lead survey operations covering offshore survey engineering, field teams, equipment readiness, crewing coordination, procurement support, workshop coordination, project execution, client interface, QA/QC, and technical deliverables for offshore, subsea, pipeline, geophysical, bathymetric, and energy infrastructure projects. - Serve as the main technical point of contact for clients including Pertamina Gas, Medco EP Natuna, and Petrovietnam. - Oversee engineering, procurement, crewing, and workshop functions supporting survey operations and project delivery. - Review and approve survey method statements, equipment/material cost estimates, and proposed survey personnel. - Review survey reports, final survey data, and as-built deliverables against project specifications prior to final sign-off. - Operations lead for the 28-inch, ~213 km O Mon PC2 gas pipeline (Petrovietnam SWPOC) across prelay, pre-engineering, construction, as-laid and as-built, including pipelay with a parallel as-laid survey. - Operations manager for the WNTS to Pemping Island gas pipeline (PLN EPI), delivered on schedule. - Plan mobilisation, equipment readiness, DGNSS, gyro and USBL calibration and crew deployment; prepared a 7-person as-laid team and procedures for the Santos PNG Kutubu pipeline project. - Analyse client scope and RFQs for offshore pipeline and platform installation tenders: survey methodology, positioning method (USBL or LBL), field deployment planning and costing. - Focal point for change management (MOC) across ASI projects: vessel and equipment spread, route and scope changes, procedure revisions after client comments, and key personnel replacement.